KSF04 - STRECKER BRUDERHAUS SYNCHROFLY SHEET CUTTER
SPECIFICATION
- Make and Model: Strecker Bruderhaus 1450 with two delivery sections (2 pieces of Secondary belts & layboys).
- Production: Capable for paper and board
- Original Age: 1976
- Modernization: Full repairing and modernization in 2007-2008 (Made by Keski-Suomen Finanssi Oy)
- Width of the cutter: 1,450 mm
- Cross cutting: Synchro cross cutting capable for paper and board 40- 600 gsm. Knife load 800 Gsm.
- Size change: Auto sheet length changing system length 400 - 1700 mm.
- Cutting accuracy: Electric sheet length control +-0,3 mm
- Speed: Speed 250 m/m.
- Overlapping section: Vacuum overlapping section.
- Reject gate: Faulty sheet control with reject gate
- Pallet change: Auto non-stop pallet change system
- Layboy: 4 side joggers and back board. Sinking hydraulic layboy with capacitive sensor for pallet height.
- Tab Inserters: 3 Tab Inserters
- Slitters: Three (3) slitters.
- Unwind: Six (6) shaft less pick-up unwind stands. Air cooled disc breaks with pneumatic adjustments. Reel core 3-6”, reel dia 1500 mm, reel weight 2000 kg.
- Lead roll system: Complete lead roll system.
- De curling units: Six (6) rolling bar-type de curlers for paper (dia 12 mm and one for board (60 mm).
- Electric: Complete electric system basing on PLC Siemens S5 380 V 50 Hz
- Side trim system: Complete side trim system with shredder, tubes and blower.
- Condition: The line is in excellent condition. Can be test run at any time. Any special overhauling or repairing are not needed.
- Location: Poland
- Test run: Can be test run with paper or board at any time
- NB 1: All tenders subject to the standard terms and conditions (Click Here)
- NB 2: All tenders to be received by 3PM CET at ceo@saxonmachinery.com or by post to
Keski-Suomen Finanssi Oy,
Sääksmäentie 1
FI-37600 Valkeakoski
Finland.
Attention: The CEO - Saxon Machinery Ltd.
- NB 3: The successful tenderers must be removed their machinery from site at the latest date of 15th of September at 12pm midday.
- Terms of payment: Payment 50% within 5 bank days of a successful bid being confirmed. The balance outstanding to be paid prior to commencement of dismantling.